These documents and the information contained therein were created as part of an integrated design for a specific site and a specific client. This information is being provided for documentation only of an existing project and is not intended for any other purpose or location. You should not attempt to use these documents for physical construction without obtaining the professional services of an architect or relevant professional licensed to practice in your U.S. state or other jurisdiction. Please refer to our Terms of Use for more information.





Posted By: Urban Studio Brooklyn
Uploaded: 9/03/2007
Type: Other
Created By: Flow Chart of the Water Reclamation System
Creation Date: 9/03/2007
Workspace: No
Adaptations: Yes
Posted By: Urban Studio Brooklyn
Uploaded: 1/01/2006
Type:
Created By: Flow Chart of the Water Reclamation System
Creation Date: 1/01/2006
Workspace: No
Adaptations: Yes
Posted By: Urban Studio Brooklyn
Uploaded: 9/02/2007
Type:
Created By: Diagram of the water reclamation system
Creation Date: 9/02/2007
Workspace: No
Adaptations: Yes
Posted By: Urban Studio Brooklyn
Uploaded: 9/03/2007
Type:
Created By: Water Reclamation System diagram
Creation Date: 9/03/2007
Workspace: No
Adaptations: Yes
Posted By: Urban Studio Brooklyn
Uploaded: 9/03/2007
Type:
Created By: Water Reclamation System diagram
Creation Date: 9/03/2007
Workspace: No
Adaptations: Yes
Posted By: Urban Studio Brooklyn
Uploaded: 9/03/2007
Type:
Created By: Tour of the Hearst Building with HVAC Engineer Paul Reitz
Creation Date: 9/03/2007
Workspace: No
Adaptations: Yes
Posted By: Urban Studio Brooklyn
Uploaded: 9/03/2007
Type:
Created By: Students working with Eric Rothstein from edesign dynamics
Creation Date: 9/03/2007
Workspace: No
Adaptations: Yes
Posted By: Urban Studio Brooklyn
Uploaded: 9/03/2007
Type:
Created By:
Creation Date: 9/03/2007
Workspace: No
Adaptations: Yes
Posted By: Urban Studio Brooklyn
Uploaded: 9/03/2007
Type:
Created By: Project Proposals to Alvaro Quintana from FxFowle Architects
Creation Date: 9/03/2007
Workspace: No
Adaptations: Yes
Posted By: Urban Studio Brooklyn
Uploaded: 9/03/2007
Type:
Created By: The Inaugural Toilet Flush
Creation Date: 9/03/2007
Workspace: No
Adaptations: Yes
Posted By: Urban Studio Brooklyn
Uploaded: 9/03/2007
Type:
Created By:
Creation Date: 9/03/2007
Workspace: No
Adaptations: Yes
Posted By: Urban Studio Brooklyn
Uploaded: 9/03/2007
Type:
Created By: Getting ready to present the project to the public
Creation Date: 9/03/2007
Workspace: No
Adaptations: Yes
Posted By: Urban Studio Brooklyn
Uploaded: 9/03/2007
Type:
Created By: Program Director, Lori Gibbs, begining the presentation to the public
Creation Date: 9/03/2007
Workspace: No
Adaptations: Yes
Posted By: Urban Studio Brooklyn
Uploaded: 9/03/2007
Type:
Created By: Greywater and rainwater reuse to flush the toilet
Creation Date: 9/03/2007
Workspace: No
Adaptations: Yes
Posted By: Urban Studio Brooklyn
Uploaded: 9/03/2007
Type:
Created By: Sink, vegetative filter, and toilet system
Creation Date: 9/03/2007
Workspace: No
Adaptations: Yes
Posted By: Urban Studio Brooklyn
Uploaded: 9/03/2007
Type:
Created By: Handwashing sink with vegetative filter that feeds into the toilet tank
Creation Date: 9/03/2007
Workspace: No
Adaptations: Yes
Posted By: Urban Studio Brooklyn
Uploaded: 9/03/2007
Type:
Created By: USBK 2007
Creation Date: 9/03/2007
Workspace: No
Adaptations: Yes
Posted By: Urban Studio Brooklyn
Uploaded: 9/03/2007
Type:
Created By: UV filter inside the restaurant
Creation Date: 9/03/2007
Workspace: No
Adaptations: Yes
Posted By: Urban Studio Brooklyn
Uploaded: 9/03/2007
Type:
Created By: Interior UV Filter (for water sanitization)
Creation Date: 9/03/2007
Workspace: No
Adaptations: Yes
Posted By: Urban Studio Brooklyn
Uploaded: 9/03/2007
Type: Finished Construction
Created By: The Green Gutter piece of the system
Creation Date: 9/03/2007
Workspace: No
Adaptations: Yes
Posted By: Urban Studio Brooklyn
Uploaded: 9/03/2007
Type:
Created By: Constructing the rainwater supply to the toilet
Creation Date: 9/03/2007
Workspace: No
Adaptations: Yes
Posted By: Urban Studio Brooklyn
Uploaded: 9/03/2007
Type: Photograph
Created By: Building the Green Gutter
Creation Date: 9/03/2007
Workspace: No
Adaptations: Yes
Posted By: Urban Studio Brooklyn
Uploaded: 9/03/2007
Type:
Created By: Putting the tank in place
Creation Date: 9/03/2007
Workspace: No
Adaptations: Yes
Posted By: Urban Studio Brooklyn
Uploaded: 9/03/2007
Type:
Created By: Taking a break on the Bike Blender
Creation Date: 9/03/2007
Workspace: No
Adaptations: Yes
Posted By: Urban Studio Brooklyn
Uploaded: 9/03/2007
Type:
Created By: Bringing the plants from the nursery
Creation Date: 9/03/2007
Workspace: No
Adaptations: Yes
Posted By: Urban Studio Brooklyn
Uploaded: 9/03/2007
Type:
Created By: Installation of the Green Gutter at Habana Outpost
Creation Date: 9/03/2007
Workspace: No
Adaptations: Yes
Posted By: Urban Studio Brooklyn
Uploaded: 9/03/2007
Type: Photograph
Created By: Getting the project proposal ready
Creation Date: 9/03/2007
Workspace: No
Adaptations: Yes
Posted By: Urban Studio Brooklyn
Uploaded: 9/03/2007
Type:
Created By: Sorting pieces for the green gutter installation
Creation Date: 9/03/2007
Workspace: No
Adaptations: Yes
Posted By: Urban Studio Brooklyn
Uploaded: 9/03/2007
Type:
Created By: Installing the toilet
Creation Date: 9/03/2007
Workspace: No
Adaptations: Yes
Posted By: Urban Studio Brooklyn
Uploaded: 9/03/2007
Type:
Created By: The wax seal
Creation Date: 9/03/2007
Workspace: No
Adaptations: Yes
Posted By: Urban Studio Brooklyn
Uploaded: 9/03/2007
Type:
Created By: Student proposals to the client, Habana Outpost owner Sean Meenan
Creation Date: 9/03/2007
Workspace: No
Adaptations: Yes
Posted By: Urban Studio Brooklyn
Uploaded: 9/03/2007
Type:
Created By: Power Point and Model Presentation to Habana Outpost owner Sean Meenan
Creation Date: 9/03/2007
Workspace: No
Adaptations: Yes
Posted By: Urban Studio Brooklyn
Uploaded: 9/03/2007
Type:
Created By: USBK student's model
Creation Date: 9/03/2007
Workspace: No
Adaptations: Yes
Posted By: Urban Studio Brooklyn
Uploaded: 9/03/2007
Type:
Created By: First round of proposals to critic Alvaro Quintana from FxFowle Architects
Creation Date: 9/03/2007
Workspace: No
Adaptations: Yes
Posted By: Urban Studio Brooklyn
Uploaded: 9/03/2007
Type:
Created By: Tour of the Hearst Building with HVAC Engineer Paul Reitz
Creation Date: 9/03/2007
Workspace: No
Adaptations: Yes